View

Notice

Share

UAA MSC GMT Generator Installation

The work for this project consists of the installation of a new standby generator, and associated work required for connection which will be located on the north east corner of the Glenn Massey Theater Building.  Additional work will include the creation of a generator pad, installation of a new gas meter, bollard construction and Automatic Transfer Switch installation.  The Contractor is responsible for the procurement of all items required to complete the installation of all work.

A complete set of documents are available online at http://dev.aeplans.com.  They may be viewed online and downloaded without charge and without deposit from http://dev.aeplans.com.  Contact Mike Strock at A/E Plans, LLC at 877-287-4905, extension 208 for information regarding access to A/E Plans site and instructions for viewing and downloading construction drawings, specifications and addenda.  Bidders must register through the web site to be notified of addenda.

It is the responsibility of the proposer to check with A/E Plans for any final addenda before submitting their Bid.

Attachments, History, Details

Attachments

None

Revision History

Created 5/11/2016 10:39:02 AM by 2f8303c2-52eb-5ded-4439-c50c6cdf4e73
Modified 5/11/2016 10:40:00 AM by 2f8303c2-52eb-5ded-4439-c50c6cdf4e73

Details

Department: University of Alaska
Category: Public Notices
Sub-Category:
Location(s): Palmer
Project/Regulation #: 15-0100
 
Publish Date: 5/11/2016
Archive Date: 6/5/2016
 
Events/Deadlines:
  • Pre-Bid Meeting
    5/20/2016 1:00pm - 2:00pm
  • Bid Opening
    6/1/2016 2:00pm - 2:30pm