View

Notice

Share

MAT-SU CAMPUS BRIDGE ENCLOSURE

This project will partially demolish a portion of the pedestrian walkway to be rebuilt as a heated
enclosed space. Existing primary structural components to remain unaffected by new work.
Demolition work includes removal of existing concrete pad and deck, roof system and chain link fence.  Steel preparation for painting at steel structure to remain, refer to bid documents for a more complete description of the work located at:

Matanuska-Susitna College
8295 East College Drive
Palmer, AK 99645

A complete set of documents are available online at http://dev.aeplans.com.  They may be viewed online and downloaded without charge and without deposit from http://dev.aeplans.com.  Contact Mike Strock at A/E Plans, LLC at 877-287-4905, extension 208 for information regarding access to A/E Plans site and instructions for viewing and downloading construction drawings, specifications and addenda.  Bidders must register through the web site to be notified of addenda.

It is the responsibility of the proposer to check with A/E Plans for any final addenda before submitting their Bid.

Attachments, History, Details

Attachments

None

Revision History

Created 4/26/2016 3:22:38 PM by 2f8303c2-52eb-5ded-4439-c50c6cdf4e73
Modified 4/26/2016 3:26:04 PM by 2f8303c2-52eb-5ded-4439-c50c6cdf4e73
Modified 4/28/2016 3:13:07 PM by 2f8303c2-52eb-5ded-4439-c50c6cdf4e73
Modified 5/16/2016 10:00:59 AM by 2f8303c2-52eb-5ded-4439-c50c6cdf4e73
Modified 5/20/2016 12:05:27 PM by 2f8303c2-52eb-5ded-4439-c50c6cdf4e73

Details

Department: University of Alaska
Category: Public Notices
Sub-Category:
Location(s): Palmer
Project/Regulation #: 09-0027
 
Publish Date: 4/26/2016
Archive Date: 5/26/2016
 
Events/Deadlines: